Drillnote

The brief

Why now

  • 11/08/2026Was drillingDiamond drilling is under way at Dunnamere Dam, with 8 holes completed to date.
  • 26/06/2026Reported drilling resultsAssay results have been received for the first 13 holes drilled at Dunnamere Dam.

Who to speak to

No one listed for this company yet.

Suggested first step
They log on paper. Lead with that and ask for the geologist who logs. They're drilling now, so offer a trial on this programme.

How they log

Paper

Good to know

  • Latest signal: 21/08/2026
  • Signals on record: 5
  • Operating mines: 0
  • Checked by hand: No
  • Your customer: No

Signals (5)

Each signal comes from a document, with the sentence behind it. Open one to see it with the people to call.

  1. 21/08/2026Exchange announcementSets the rank

    Had six to twelve months of funding

    Cash of $2 million at the end of the quarter funds the planned programme for the next three quarters.

    They're funded for six to twelve months. That covers this programme.

    Open the source
  2. 11/08/2026Exchange announcementSets the rank

    Was drilling

    Diamond drilling is under way at Dunnamere Dam, with 8 holes completed to date.

    Core is coming out of the ground now, so logging is a live job for their geologists.

    Open the source
  3. 26/06/2026Exchange announcementSets the rank

    Reported drilling results

    Assay results have been received for the first 13 holes drilled at Dunnamere Dam.

    They've drilled recently and are reporting on it, so the logging work is fresh.

    Open the source
  4. 18/12/2025Exchange announcementSets the rank

    Logs on paper

    Core is logged by hand on paper logging sheets and entered into the database at the site office.

    They log on paper. That's the clearest fit for digital core logging.

    Open the source

Also on record (1)

Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

  1. 25/02/2026Exchange announcement

    Reported drilling results

    Assay results have been received for the first 14 holes drilled at Dunnamere Dam.

    They've drilled recently and are reporting on it, so the logging work is fresh.

    Open the source

People (0)

No one listed for this company yet.

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this company

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.