Logs in spreadsheets
The signal
Their words
Geological logging is recorded in Excel templates on field laptops.
Why it matters
They log in spreadsheets, so there's no logging system to replace.
Where it comes from
- Source: Exchange announcement
- Document date: 04/05/2026
- Sets the company's rank: Yes
- Checked by hand: Yes
Dunnaroo Copper
- 24/09/2026Was drilling
The 8,000 metre programme at Coolawick Gap is in progress, with about half of the metres drilled.
- 31/07/2026Published a new or updated resource estimate
An updated mineral resource estimate for Coolawick Gap has been released, based on 235 drill holes.
Suggested first step They log in Excel. Lead with that and ask for the geologist who logs. They're drilling now, so offer a trial on this programme.
People to call about it (4)
Who to speak to at Dunnaroo Copper, decision maker first.
Decision maker
Hamish Vasquez
Exploration Manager
- Where we found them
- LinkedIn profileChecked 04/10/2026
Daily user
Lachlan Morrow
Senior Geologist
- l•••••
@du•••••.com.au Verified - Where we found them
- Company announcementChecked 07/10/2026
Sponsor
Angus Eastman
Managing Director
- a•••••
@du•••••.com.au Verified - Where we found them
- Company announcementChecked 05/10/2026
Daily user
Bronte Hendry
Project Geologist
- b•••••
@du•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 09/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Dunnaroo Copper (3)
Each one opens the same way.
Was drilling
The 8,000 metre programme at Coolawick Gap is in progress, with about half of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Coolawick Gap has been released, based on 235 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the source
Also on record (1)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Reported drilling results
Assay results have been received for the first 18 holes drilled at Coolawick Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.