Was drilling
The signal
Their words
Drilling continues at Hallowby Crossing, with two rigs on site.
Why it matters
Core is coming out of the ground now, so logging is a live job for their geologists.
Where it comes from
- Source: Exchange announcement
- Document date: 11/09/2026
- Sets the company's rank: Yes
- Checked by hand: Yes
Fernaroo Resources
- 11/09/2026Was drilling
Drilling continues at Hallowby Crossing, with two rigs on site.
- 13/07/2026Published a new or updated resource estimate
An updated mineral resource estimate for Hallowby Crossing has been released, based on 104 drill holes.
Suggested first step They log in Excel. Lead with that and ask for the geologist who logs. They're drilling now, so offer a trial on this programme.
People to call about it (4)
Who to speak to at Fernaroo Resources, decision maker first.
Decision maker
Ethan Kowalski
Exploration Manager
- e•••••
@fe•••••.com.au Verified, on another domain - Where we found them
- Company announcementChecked 03/10/2026
Daily user
Wendy Kowalski
Senior Geologist
- w•••••
@fe•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 07/10/2026
Sponsor
Xavier Mwangi
Managing Director
- x•••••
@fe•••••.com.au Verified - Where we found them
- Company announcementChecked 11/10/2026
Daily user
Declan Whitlam
Project Geologist
- d•••••
@fe•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 03/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Fernaroo Resources (3)
Each one opens the same way.
Had a tenement granted
2 exploration licences near Hallowby Crossing were granted to Fernaroo Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Hallowby Crossing has been released, based on 104 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the source
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.