Was drilling
The signal
Their words
The 8,000 metre programme at Mirrabrae Crossing is in progress, with about a third of the metres drilled.
Why it matters
Core is coming out of the ground now, so logging is a live job for their geologists.
Where it comes from
- Source: Exchange announcement
- Document date: 24/09/2026
- Sets the company's rank: Yes
- Checked by hand: Yes
Jundabar Lithium
- 24/09/2026Was drilling
The 8,000 metre programme at Mirrabrae Crossing is in progress, with about a third of the metres drilled.
- 15/09/2025Logs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
Suggested first step They log in Access. Lead with that and ask for the geologist who logs. They're drilling now, so offer a trial on this programme.
People to call about it (3)
Who to speak to at Jundabar Lithium, decision maker first.
Decision maker
Elena Farrow
Exploration Manager
- e•••••
@ju•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 06/10/2026
Daily user
Sam Winterton
Senior Geologist
- s•••••
@ju•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 07/10/2026
Sponsor
Marcus Fraser
Managing Director
- m•••••
@ju•••••.com.au Verified - Where we found them
- Company announcementChecked 06/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Jundabar Lithium (1)
Each one opens the same way.
Logs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the source
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.