Had just finished a drilling programme
The signal
Their words
The drilling programme at Kerrawick Tank was completed during the quarter, for 47 holes and 18,000 metres.
Why it matters
The programme has just finished. The logs are being checked and pulled together now.
Where it comes from
- Source: Exchange announcement
- Document date: 21/08/2026
- Sets the company's rank: Yes
- Checked by hand: Not yet
Penthaby Copper
- 15/09/2026Reported drilling results
Results from 12 holes at Kerrawick Tank confirm mineralisation over 3 kilometres of strike.
- 21/08/2026Had just finished a drilling programme
The drilling programme at Kerrawick Tank was completed during the quarter, for 47 holes and 18,000 metres.
Suggested first step They log on paper. Lead with that and ask for the geologist who logs. They've just drilled, so ask how the logs are being pulled together.
People to call about it (0)
No one listed for this company yet.
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Penthaby Copper (3)
Each one opens the same way.
Reported drilling results
Results from 12 holes at Kerrawick Tank confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad six to twelve months of funding
Cash of $2 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.