Was hiring for a field or core yard role
The signal
Their words
Field assistants and a core yard technician are needed at Jarrabrae Flat for the coming drilling season.
Why it matters
They're adding field or core yard staff, which points to drilling ahead.
Where it comes from
- Source: Job advertisement
- Document date: 18/08/2026
- Sets the company's rank: Yes
- Checked by hand: Yes
Rossabin Resources
- 17/07/2026Said drilling would start soon
A 14,000 metre reverse circulation drilling programme at Jarrabrae Flat is scheduled to start in November.
- 20/08/2026Published a new or updated resource estimate
An updated mineral resource estimate for Jarrabrae Flat has been released, based on 547 drill holes.
Suggested first step Drilling is close, so call before the rig is set up.
People to call about it (4)
Who to speak to at Rossabin Resources, decision maker first.
Decision maker
Lachlan Thackeray
Exploration Manager
- l•••••
@ro•••••.com.au Verified - Where we found them
- LinkedIn profileChecked 04/10/2026
Daily user
Priya Holloway
Senior Geologist
- p•••••
@ro•••••.com.au Verified - Where we found them
- Company announcementChecked 05/10/2026
Sponsor
Anika Iverson
Managing Director
- a•••••
@ro•••••.com.au Verified - Where we found them
- Company announcementChecked 10/10/2026
Daily user
Marcus Banerjee
Project Geologist
- m•••••
@ro•••••.com.au Verified, on another domain - Where we found them
- LinkedIn profileChecked 08/10/2026
Notes (0)
Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.
Thanks. In the live portal that report reaches us, and we check it against the source before the next update.
Report a problem with this signal
Other signals from Rossabin Resources (6)
Each one opens the same way.
Published a new or updated resource estimate
An updated mineral resource estimate for Jarrabrae Flat has been released, based on 547 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad more than a year of funding
The company held $27 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceSaid drilling would start soon
A 14,000 metre reverse circulation drilling programme at Jarrabrae Flat is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceHad a tenement granted
5 exploration licences near Jarrabrae Flat were granted to Rossabin Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the source
Also on record (2)
Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.
Reported drilling results
Assay results have been received for the first 27 holes drilled at Jarrabrae Flat.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceReported drilling results
Results from 20 holes at Jarrabrae Flat confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.