Drillnote

The signal

Their words

The company held $41 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.

Why it matters

They're funded for more than a year, so a purchase is realistic.

Where it comes from

  • Source: Exchange announcement
  • Document date: 18/09/2026
  • Sets the company's rank: Yes
  • Checked by hand: Yes

Open the source

People to call about it (2)

Who to speak to at Saltmarrow Nickel, decision maker first.

  • Decision maker

    Grace Thackeray

    Exploration Manager

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 06/10/2026
  • Daily user

    Amara Mwangi

    Senior Geologist

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 05/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Saltmarrow Nickel (4)

    Each one opens the same way.

    1. 26/08/2026Exchange announcementSets the rank

      Was drilling

      Diamond drilling is under way at Dunnamere Dam, with 21 holes completed to date.

      Core is coming out of the ground now, so logging is a live job for their geologists.

      Open the source
    2. 07/05/2026Exchange announcementSets the rank

      Logs in spreadsheets

      Geological logging is recorded in Excel templates on field laptops.

      They log in spreadsheets, so there's no logging system to replace.

      Open the source

    Also on record (2)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 13/02/2026Exchange announcement

      Reported drilling results

      Results from 13 holes at Dunnamere Dam confirm mineralisation over 4 kilometres of strike.

      They've drilled recently and are reporting on it, so the logging work is fresh.

      Open the source
    2. 01/01/2026Exchange announcement

      Reported drilling results

      Assay results have been received for the first 25 holes drilled at Dunnamere Dam.

      They've drilled recently and are reporting on it, so the logging work is fresh.

      Open the source

    Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.