Drillnote

The signal

Their words

We are looking for two Exploration Geologists to join our Farrindoo Well team on a eight days on, six days off roster.

Why it matters

They're adding geologists, which usually means more core to log.

Where it comes from

  • Source: Job advertisement
  • Document date: 03/07/2026
  • Sets the company's rank: No
  • Checked by hand: Not yet

Open the source

People to call about it (2)

Who to speak to at Wondalee Nickel, decision maker first.

  • Decision maker

    Maeve Hendry

    Exploration Manager

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 07/10/2026
  • Daily user

    Hamish Galloway

    Senior Geologist

    Email
    Verified
    Where we found them
    LinkedIn profileChecked 04/10/2026

Notes (0)

Shared with everyone on your team who has a login. In this demo, what you add stays in your browser and nothing is sent.

    Report a problem with this signal

    Tell us if something is wrong or doesn't look right. We check it against the source and fix it in the next update.

    Other signals from Wondalee Nickel (5)

    Each one opens the same way.

    1. 02/10/2026Exchange announcementSets the rank

      Said drilling would start soon

      A 21,000 metre reverse circulation drilling programme at Farrindoo Well is scheduled to start in November.

      Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.

      Open the source
    2. 19/08/2026Exchange announcementSets the rank

      Raised money for drilling

      The company has raised $8 million in a entitlement offer to fund drilling at Farrindoo Well.

      The money for drilling is raised, so the programme is likely to go ahead.

      Open the source
    3. 17/08/2026Exchange announcementSets the rank

      Reported drilling results

      Results from 14 holes at Farrindoo Well confirm mineralisation over 2 kilometres of strike.

      They've drilled recently and are reporting on it, so the logging work is fresh.

      Open the source
    4. 20/11/2025Exchange announcementSets the rank

      Logs on paper

      Lithology and structure are logged on paper sheets and typed up at the end of each shift.

      They log on paper. That's the clearest fit for digital core logging.

      Open the source

    Also on record (1)

    Other things the company said, newest first. They didn't set the rank and most haven't been checked by hand.

    1. 24/04/2026State tenement register

      Applied for a tenement

      Wondalee Nickel applied for an exploration licence of 129 blocks adjoining Farrindoo Well.

      They've applied for new ground. It's an early sign of exploration to come.

      Open the source

    Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.