Signals
Everything the companies on the list said that we picked up. Each signal is quoted, dated and linked. Open one to see why it matters and who to call.
All signals
No signals match. Clear the filters
Said drilling would start soon
A 24,000 metre reverse circulation drilling programme at Pirrimoor Soak is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 16 holes drilled at Pirrimoor Soak.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad a tenement granted
3 exploration licences near Pirrimoor Soak were granted to Pindarrow Rare Earths.
New ground has been granted. Exploration and drilling usually follow.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Pirrimoor Soak has been released, based on 384 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas cash flow positive
Operations at Pirrimoor Soak were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Pirrimoor Soak team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Results from 19 holes at Pirrimoor Soak confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Said drilling would start soon
The company will begin an 11,000 metre programme at Garrowmere Hill in December, once site access is complete.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceWas cash flow positive
Operations at Garrowmere Hill were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourceRaised money for exploration
Proceeds of the $6 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Reported drilling results
Assay results have been received for the first 23 holes drilled at Hollindee Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas buying a mine or project
Irrowick Copper has signed a binding agreement to buy the Coolawick Gap project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Hollindee Gap for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourceHad more than a year of funding
The company held $42 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceSaid more drilling is planned
Further drilling is planned at Hollindee Gap to follow up these results.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceApplied for a tenement
Irrowick Copper applied for an exploration licence of 85 blocks adjoining Hollindee Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceApplied for a tenement
Irrowick Copper applied for an exploration licence of 43 blocks adjoining Hollindee Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Was drilling
Diamond drilling is under way at Wendiloo Creek, with 22 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas cash flow positive
Operations at Wendiloo Creek were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceReported drilling results
Results from 24 holes at Wendiloo Creek confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Wendiloo Creek has been released, based on 188 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceApplied for a tenement
Islowick Nickel applied for an exploration licence of 44 blocks adjoining Wendiloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Said drilling would start soon
The company will begin a 7,000 metre programme at Pirrimoor Soak in December, once site access is complete.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceHad more than a year of funding
The company held $55 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceReported drilling results
Assay results have been received for the first 29 holes drilled at Pirrimoor Soak.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Pirrimoor Soak has been released, based on 137 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceRaised money for exploration
Proceeds of the $6 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was drilling
Diamond drilling is under way at Tarrowin Ridge, with 33 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Results from 13 holes at Tarrowin Ridge confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Tarrowin Ridge has been released, based on 420 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas cash flow positive
Operations at Tarrowin Ridge were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Was cash flow positive
Operations at Coolawick Gap were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceApplied for a tenement
Ushabeck Minerals applied for an exploration licence of 73 blocks adjoining Coolawick Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas drilling
The 5,000 metre programme at Coolawick Gap is in progress, with about a third of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Results from 26 holes at Coolawick Gap confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceBought a mine or project
Ushabeck Minerals has completed its purchase of the Wendiloo Creek project and its drill hole database.
They've just taken over a mine or project and its drilling data.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Coolawick Gap team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Results from 20 holes at Coolawick Gap confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Was drilling
Diamond drilling is under way at Brannowin Well, with 6 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceWas cash flow positive
Operations at Brannowin Well were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceReported drilling results
Results from 34 holes at Brannowin Well confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceBought a mine or project
Gillaby Resources has completed its purchase of the Morrowick Hill project and its drill hole database.
They've just taken over a mine or project and its drilling data.
Open the sourceWas hiring a geology leader
Gillaby Resources is recruiting an Exploration Manager to lead its Victoria team.
A new geology leader often reviews the tools the team uses.
Open the source
Had more than a year of funding
The company held $32 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Stannabrook Flat has been released, based on 141 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas drilling
Drilling continues at Stannabrook Flat, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Stannabrook Flat team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceHad a tenement granted
3 exploration licences near Stannabrook Flat were granted to Umberlow Rare Earths.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceApplied for a tenement
Umberlow Rare Earths applied for an exploration licence of 96 blocks adjoining Stannabrook Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Published a new or updated resource estimate
An updated mineral resource estimate for Wendiloo Creek has been released, based on 402 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad more than a year of funding
The company held $41 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceWas drilling
The 18,000 metre programme at Wendiloo Creek is in progress, with about a third of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Assay results have been received for the first 19 holes drilled at Wendiloo Creek.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad a tenement granted
5 exploration licences near Wendiloo Creek were granted to Varrowmere Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceApplied for a tenement
Varrowmere Resources applied for an exploration licence of 97 blocks adjoining Wendiloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Was drilling
Reverse circulation drilling is under way at Wollabeck Hill, with 15 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Assay results have been received for the first 9 holes drilled at Wollabeck Hill.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Wollabeck Hill has been released, based on 555 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceReported drilling results
Results from 16 holes at Wollabeck Hill confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Wollabeck Hill team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Was hiring a geologist
We are looking for two Exploration Geologists to join our Dunnamere Dam team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceSaid more drilling is planned
Follow-up drilling at Dunnamere Dam is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceReported drilling results
Results from 30 holes at Dunnamere Dam confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Cullamere Exploration applied for an exploration licence of 57 blocks adjoining Dunnamere Dam.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceHad more than a year of funding
The company held $52 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Results from 21 holes at Dunnamere Dam confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for exploration
Proceeds of the $12 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was hiring a geology leader
Yellabrook Gold is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the sourceWas buying a mine or project
Yellabrook Gold has signed a binding agreement to buy the Stannabrook Flat project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceSaid more drilling is planned
Follow-up drilling at Windabeck Soak is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceRaised money for exploration
Proceeds of the $8 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was drilling
Drilling continues at Hallowby Crossing, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceHad a tenement granted
2 exploration licences near Hallowby Crossing were granted to Fernaroo Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Hallowby Crossing has been released, based on 104 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the source
Was drilling
The 8,000 metre programme at Coolawick Gap is in progress, with about half of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Coolawick Gap has been released, based on 235 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourceReported drilling results
Assay results have been received for the first 18 holes drilled at Coolawick Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Had more than a year of funding
The company held $41 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceWas drilling
Diamond drilling is under way at Dunnamere Dam, with 21 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourceReported drilling results
Results from 13 holes at Dunnamere Dam confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceReported drilling results
Assay results have been received for the first 25 holes drilled at Dunnamere Dam.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Had a tenement granted
3 exploration licences near Larrowby Bore were granted to Zellaby Rare Earths.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceSaid drilling would start soon
A 4,000 metre reverse circulation drilling programme at Larrowby Bore is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Results from 22 holes at Larrowby Bore confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourceRaised money for exploration
Proceeds of the $15 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Had more than a year of funding
The company held $37 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceReported drilling results
Results from 36 holes at Gennaloo Creek confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geology leader
Ellabrae Copper is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Gennaloo Creek has been released, based on 223 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceRaised money for exploration
Proceeds of the $14 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was drilling
The 8,000 metre programme at Mirrabrae Crossing is in progress, with about a third of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the source
Was drilling
Drilling continues at Pellowin Gap, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceWas selling a mine or project
Cobbinar Rare Earths has agreed to sell its Morrowick Hill project to focus on Pellowin Gap.
They're selling a mine or project. The drilling data has to be handed over in good order.
Open the source
Reported drilling results
Results from 30 holes at Hembaloo Flat confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas drilling
Reverse circulation drilling is under way at Hembaloo Flat, with 9 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceHad a tenement granted
5 exploration licences near Hembaloo Flat were granted to Oldercombe Gold.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceRaised money for exploration
Proceeds of the $3 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was drilling
Drilling continues at Coolawick Gap, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceHad more than a year of funding
The company held $30 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Coolawick Gap team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Assay results have been received for the first 11 holes drilled at Coolawick Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Published a new or updated resource estimate
An updated mineral resource estimate for Jarrabrae Flat has been released, based on 547 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Jarrabrae Flat for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourceHad more than a year of funding
The company held $27 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceSaid drilling would start soon
A 14,000 metre reverse circulation drilling programme at Jarrabrae Flat is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceHad a tenement granted
5 exploration licences near Jarrabrae Flat were granted to Rossabin Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceReported drilling results
Assay results have been received for the first 27 holes drilled at Jarrabrae Flat.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceReported drilling results
Results from 20 holes at Jarrabrae Flat confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Had more than a year of funding
The company held $49 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceApplied for a tenement
Yorrabin Exploration applied for an exploration licence of 25 blocks adjoining Jellamere Dam.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceSaid drilling would start soon
A 5,000 metre reverse circulation drilling programme at Jellamere Dam is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Jellamere Dam has been released, based on 408 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the source
Reported drilling results
Results from 35 holes at Belmarrup Well confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Arkenby Copper applied for an exploration licence of 129 blocks adjoining Belmarrup Well.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceHad more than a year of funding
The company held $26 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas selling a mine or project
Arkenby Copper has agreed to sell its Jarrabrae Flat project to focus on Belmarrup Well.
They're selling a mine or project. The drilling data has to be handed over in good order.
Open the sourceApplied for a tenement
Arkenby Copper applied for an exploration licence of 116 blocks adjoining Belmarrup Well.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceRaised money for exploration
Proceeds of the $12 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was cash flow positive
Operations at Yarnabeck Bore were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceReported drilling results
Results from 28 holes at Yarnabeck Bore confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the source
Reported drilling results
Assay results have been received for the first 22 holes drilled at Hollindee Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid more drilling is planned
Follow-up drilling at Hollindee Gap is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceReported drilling results
Results from 15 holes at Hollindee Gap confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Published a new or updated resource estimate
An updated mineral resource estimate for Dallowick Creek has been released, based on 455 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceReported drilling results
Results from 19 holes at Dallowick Creek confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad a tenement granted
2 exploration licences near Dallowick Creek were granted to Stenwick Copper.
New ground has been granted. Exploration and drilling usually follow.
Open the source
Reported drilling results
Results from 26 holes at Vennamoor Creek confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Said more drilling is planned
Follow-up drilling at Vennamoor Creek is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Vennamoor Creek project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceHad a tenement granted
4 exploration licences near Vennamoor Creek were granted to Lantabar Rare Earths.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceWas selling a mine or project
Lantabar Rare Earths has agreed to sell its Wollabeck Hill project to focus on Vennamoor Creek.
They're selling a mine or project. The drilling data has to be handed over in good order.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Was drilling
Drilling continues at Morrowick Hill, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Results from 17 holes at Morrowick Hill confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad more than a year of funding
The company held $23 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Morrowick Hill project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the source
Had more than a year of funding
The company held $39 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Ombrelee Ridge has been released, based on 558 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceReported drilling results
Assay results have been received for the first 28 holes drilled at Ombrelee Ridge.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geology leader
Carrindon Minerals is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the sourceApplied for a tenement
Carrindon Minerals applied for an exploration licence of 32 blocks adjoining Ombrelee Ridge.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Reported drilling results
Results from 29 holes at Hembaloo Flat confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid more drilling is planned
Further drilling is planned at Hembaloo Flat to follow up these results.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceWas cash flow positive
Operations at Hembaloo Flat were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the source
Logs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceHad a tenement granted
4 exploration licences near Lowanbeck Bore were granted to Inglemoor Nickel.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceWas cash flow positive
Operations at Lowanbeck Bore were cash flow positive for the quarter.
The operation pays for itself, so there's budget for tools.
Open the sourceWas drilling
The 14,000 metre programme at Lowanbeck Bore is in progress, with about a third of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceWas hiring a geology leader
Inglemoor Nickel is recruiting an Exploration Manager to lead its Queensland team.
A new geology leader often reviews the tools the team uses.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Lowanbeck Bore team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Said drilling would start soon
Drill rigs have been secured and drilling at Rummabin Rise is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 29 holes drilled at Rummabin Rise.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for exploration
Proceeds of the $2 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geology leader
Illawen Nickel is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceRaised money for exploration
Proceeds of the $6 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Said drilling would start soon
A 21,000 metre reverse circulation drilling programme at Farrindoo Well is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for drilling
The company has raised $8 million in a entitlement offer to fund drilling at Farrindoo Well.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceReported drilling results
Results from 14 holes at Farrindoo Well confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Farrindoo Well team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceApplied for a tenement
Wondalee Nickel applied for an exploration licence of 129 blocks adjoining Farrindoo Well.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Said drilling would start soon
Drill rigs have been secured and drilling at Larrowby Bore is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Results from 38 holes at Larrowby Bore confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for drilling
The company has raised $31 million in a placement to fund drilling at Larrowby Bore.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Assay results have been received for the first 25 holes drilled at Larrowby Bore.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceReported drilling results
Assay results have been received for the first 14 holes drilled at Larrowby Bore.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Said drilling would start soon
Drill rigs have been secured and drilling at Tarrowin Ridge is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for drilling
The company has raised $36 million in a entitlement offer to fund drilling at Tarrowin Ridge.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceReported drilling results
Results from 23 holes at Tarrowin Ridge confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceApplied for a tenement
Hollabin Nickel applied for an exploration licence of 51 blocks adjoining Tarrowin Ridge.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Tarrowin Ridge team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Said drilling would start soon
A 25,000 metre reverse circulation drilling programme at Pellowin Gap is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 30 holes drilled at Pellowin Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Pellowin Gap project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Pellowin Gap has been released, based on 542 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceRaised money for drilling
The company has raised $29 million in a placement to fund drilling at Pellowin Gap.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceApplied for a tenement
Quendary Nickel applied for an exploration licence of 92 blocks adjoining Pellowin Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Said drilling would start soon
The company will begin a 6,000 metre programme at Brannowin Well in December, once site access is complete.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceHad more than a year of funding
The company held $46 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceReported drilling results
Assay results have been received for the first 29 holes drilled at Brannowin Well.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Assay results have been received for the first 7 holes drilled at Brannowin Well.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Dorrabeck Resources applied for an exploration licence of 37 blocks adjoining Brannowin Well.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Said drilling would start soon
A 13,000 metre diamond drilling programme at Morrowick Hill is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Results from 9 holes at Morrowick Hill confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for exploration
Proceeds of the $8 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Said drilling would start soon
Drill rigs have been secured and drilling at Nullowby Tank is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for exploration
Proceeds of the $14 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Nullowby Tank team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceHad a tenement granted
5 exploration licences near Nullowby Tank were granted to Goolabin Minerals.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Nullowby Tank team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Results from 29 holes at Nullowby Tank confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Said drilling would start soon
Drill rigs have been secured and drilling at Garrowmere Hill is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceApplied for a tenement
Tindaree Gold applied for an exploration licence of 87 blocks adjoining Garrowmere Hill.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceReported drilling results
Results from 40 holes at Garrowmere Hill confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Garrowmere Hill project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Victoria tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceRaised money for exploration
Proceeds of the $4 million placement will be applied to exploration across the company's Victoria tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Assay results have been received for the first 20 holes drilled at Garrowmere Hill.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Said drilling would start soon
The company will begin an 8,000 metre programme at Quarramere Dam in November, once site access is complete.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Quarramere Dam has been released, based on 458 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad a tenement granted
4 exploration licences near Quarramere Dam were granted to Eskerton Copper.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceWas hiring a geology leader
Eskerton Copper is recruiting an Exploration Manager to lead its Tasmania team.
A new geology leader often reviews the tools the team uses.
Open the sourceRaised money for exploration
Proceeds of the $13 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Quarramere Dam team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Assay results have been received for the first 26 holes drilled at Quarramere Dam.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Published a new or updated resource estimate
An updated mineral resource estimate for Arrabindy Rise has been released, based on 398 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceSaid drilling would start soon
A 19,000 metre reverse circulation drilling programme at Arrabindy Rise is scheduled to start in November.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 9 holes drilled at Arrabindy Rise.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Arrabindy Rise project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceHad six to twelve months of funding
Cash of $5 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the source
Orrowin Resources
Priority twoSaid drilling would start soon
Drill rigs have been secured and drilling at Farrindoo Well is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Farrindoo Well for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourceRaised money for drilling
The company has raised $38 million in a placement to fund drilling at Farrindoo Well.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceRaised money for exploration
Proceeds of the $14 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Results from 30 holes at Farrindoo Well confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Tumbrewick Metals
Priority twoReported drilling results
Results from 28 holes at Windabeck Soak confirm mineralisation over 4 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Windabeck Soak for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourceHad a tenement granted
2 exploration licences near Windabeck Soak were granted to Tumbrewick Metals.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceSaid more drilling is planned
Follow-up drilling at Windabeck Soak is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceHad more than a year of funding
The company held $39 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceRaised money for exploration
Proceeds of the $11 million placement will be applied to exploration across the company's Victoria tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Brackenlow Minerals
Priority twoRaised money for drilling
The company has raised $18 million in a placement to fund drilling at Hembaloo Flat.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Hembaloo Flat is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Hembaloo Flat has been released, based on 218 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceApplied for a tenement
Brackenlow Minerals applied for an exploration licence of 40 blocks adjoining Hembaloo Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceApplied for a tenement
Brackenlow Minerals applied for an exploration licence of 28 blocks adjoining Hembaloo Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Dellanup Exploration
Priority twoSaid drilling would start soon
A 6,000 metre reverse circulation drilling programme at Stannabrook Flat is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for drilling
The company has raised $22 million in a placement to fund drilling at Stannabrook Flat.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceApplied for a tenement
Dellanup Exploration applied for an exploration licence of 34 blocks adjoining Stannabrook Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Stannabrook Flat team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceApplied for a tenement
Dellanup Exploration applied for an exploration licence of 28 blocks adjoining Stannabrook Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Yarrendon Nickel
Priority twoPublished a new or updated resource estimate
An updated mineral resource estimate for Ombrelee Ridge has been released, based on 91 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas hiring a geology leader
Yarrendon Nickel is recruiting an Exploration Manager to lead its Tasmania team.
A new geology leader often reviews the tools the team uses.
Open the sourceReported drilling results
Results from 34 holes at Ombrelee Ridge confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for drilling
The company has raised $10 million in a share purchase plan to fund drilling at Ombrelee Ridge.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas drilling
Drilling continues at Ombrelee Ridge, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceApplied for a tenement
Yarrendon Nickel applied for an exploration licence of 77 blocks adjoining Ombrelee Ridge.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceRaised money for exploration
Proceeds of the $4 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Rennowick Metals
Priority twoSaid drilling would start soon
An 8,000 metre diamond drilling programme at Wollabeck Hill is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceHad more than a year of funding
The company held $46 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceApplied for a tenement
Rennowick Metals applied for an exploration licence of 130 blocks adjoining Wollabeck Hill.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Culberry Copper
Priority twoRaised money for exploration
Proceeds of the $15 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Dallowick Creek is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the source
Sunderoo Copper
Priority twoReported drilling results
Assay results have been received for the first 21 holes drilled at Hallowby Crossing.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Hallowby Crossing is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for exploration
Proceeds of the $11 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Assay results have been received for the first 17 holes drilled at Hallowby Crossing.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Hallowby Crossing team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Mundabrook Metals
Priority twoHad just finished a drilling programme
The drilling programme at Gennaloo Creek was completed during the quarter, for 53 holes and 4,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas buying a mine or project
Mundabrook Metals has signed a binding agreement to buy the Maddabrae Dam project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceApplied for a tenement
Mundabrook Metals applied for an exploration licence of 139 blocks adjoining Gennaloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceRaised money for exploration
Proceeds of the $8 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Gennaloo Creek for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Gennaloo Creek team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Vennaroo Nickel
Priority twoRaised money for exploration
Proceeds of the $15 million placement will be applied to exploration across the company's Victoria tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Results from 27 holes at Hallowby Crossing confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Hallowby Crossing is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 26 holes drilled at Hallowby Crossing.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Vennaroo Nickel applied for an exploration licence of 62 blocks adjoining Hallowby Crossing.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Kellowra Copper
Priority twoWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Morrowick Hill project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Morrowick Hill is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Assay results have been received for the first 13 holes drilled at Morrowick Hill.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad a tenement granted
3 exploration licences near Morrowick Hill were granted to Kellowra Copper.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceRaised money for exploration
Proceeds of the $13 million placement will be applied to exploration across the company's New South Wales tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceApplied for a tenement
Kellowra Copper applied for an exploration licence of 59 blocks adjoining Morrowick Hill.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Ennabrook Gold
Priority twoSaid drilling would start soon
A 21,000 metre diamond drilling programme at Yendaree Rise is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceRaised money for drilling
The company has raised $8 million in a entitlement offer to fund drilling at Yendaree Rise.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceReported drilling results
Results from 15 holes at Yendaree Rise confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geology leader
Ennabrook Gold is recruiting an Exploration Manager to lead its Northern Territory team.
A new geology leader often reviews the tools the team uses.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Yendaree Rise team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Darrimoor Exploration
Priority twoWas hiring a geologist
We are looking for two Exploration Geologists to join our Wendiloo Creek team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Wendiloo Creek has been released, based on 81 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad more than a year of funding
The company held $24 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceSaid drilling would start soon
The company will begin a 6,000 metre programme at Wendiloo Creek in November, once site access is complete.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 19 holes drilled at Wendiloo Creek.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Wendiloo Creek team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Vollaby Copper
Priority twoRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Assay results have been received for the first 8 holes drilled at Corrabeth Ridge.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Corrabeth Ridge team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Corrabeth Ridge is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceHad a tenement granted
2 exploration licences near Corrabeth Ridge were granted to Vollaby Copper.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Corrabeth Ridge team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Corrabeth Ridge team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Glendabar Lithium
Priority twoPublished a new or updated resource estimate
An updated mineral resource estimate for Yarnabeck Bore has been released, based on 278 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad six to twelve months of funding
Cash of $7 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Yarnabeck Bore project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Yarnabeck Bore is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceRaised money for exploration
Proceeds of the $4 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Corrowind Resources
Priority twoWas drilling
Drilling continues at Belmarrup Well, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceRaised money for exploration
Proceeds of the $12 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Results from 20 holes at Belmarrup Well confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Corrowind Resources applied for an exploration licence of 102 blocks adjoining Belmarrup Well.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Jennamoor Nickel
Priority twoHad just finished a drilling programme
The drilling programme at Jarrabrae Flat was completed during the quarter, for 49 holes and 8,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceHad six to twelve months of funding
Cash of $3 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceWas buying a mine or project
Jennamoor Nickel has signed a binding agreement to buy the Windabeck Soak project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceReported drilling results
Assay results have been received for the first 25 holes drilled at Jarrabrae Flat.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad a tenement granted
4 exploration licences near Jarrabrae Flat were granted to Jennamoor Nickel.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Jarrabrae Flat team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceApplied for a tenement
Jennamoor Nickel applied for an exploration licence of 26 blocks adjoining Jarrabrae Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Gowerby Minerals
Priority twoReported drilling results
Assay results have been received for the first 21 holes drilled at Corrabeth Ridge.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid more drilling is planned
Follow-up drilling at Corrabeth Ridge is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceWas buying a mine or project
Gowerby Minerals has signed a binding agreement to buy the Hembaloo Flat project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceRaised money for exploration
Proceeds of the $12 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Corrabeth Ridge team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceRaised money for exploration
Proceeds of the $14 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Evenby Resources
Priority twoHad six to twelve months of funding
Cash of $2 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceWas drilling
Diamond drilling is under way at Dunnamere Dam, with 8 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceReported drilling results
Assay results have been received for the first 13 holes drilled at Dunnamere Dam.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Core is logged by hand on paper logging sheets and entered into the database at the site office.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Assay results have been received for the first 14 holes drilled at Dunnamere Dam.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Hartabin Exploration
Priority twoHad a tenement granted
4 exploration licences near Bindlemoor Tank were granted to Hartabin Exploration.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceHad just finished a drilling programme
The drilling programme at Bindlemoor Tank was completed during the quarter, for 46 holes and 3,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceRaised money for exploration
Proceeds of the $3 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Results from 24 holes at Bindlemoor Tank confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Kettlemoor Exploration
Priority twoReported drilling results
Results from 15 holes at Lowanbeck Bore confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for drilling
The company has raised $30 million in a placement to fund drilling at Lowanbeck Bore.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceWas drilling
Drilling continues at Lowanbeck Bore, with two rigs on site.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Lowanbeck Bore project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceRaised money for exploration
Proceeds of the $9 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Penthaby Copper
Priority twoReported drilling results
Results from 12 holes at Kerrawick Tank confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad just finished a drilling programme
The drilling programme at Kerrawick Tank was completed during the quarter, for 47 holes and 18,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceHad six to twelve months of funding
Cash of $2 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Jarrowin Lithium
Priority twoPublished a new or updated resource estimate
An updated mineral resource estimate for Farrindoo Well has been released, based on 453 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceHad just finished a drilling programme
The drilling programme at Farrindoo Well was completed during the quarter, for 25 holes and 18,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceRaised money for drilling
The company has raised $36 million in a share purchase plan to fund drilling at Farrindoo Well.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceRaised money for exploration
Proceeds of the $2 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Lorrimby Resources
Priority twoHad just finished a drilling programme
The drilling programme at Tuddamere Hill was completed during the quarter, for 25 holes and 8,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceWas buying a mine or project
Lorrimby Resources has signed a binding agreement to buy the Garrowmere Hill project.
They're taking on a mine or project. New owners often review how data is captured.
Open the sourceHad six to twelve months of funding
Cash of $4 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Tuddamere Hill team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Yandermere Minerals
Priority twoSaid more drilling is planned
Further drilling is planned at Mirrabrae Crossing to follow up these results.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceReported drilling results
Assay results have been received for the first 9 holes drilled at Mirrabrae Crossing.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad more than a year of funding
The company held $59 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the source
Jindabrook Minerals
Priority twoReported drilling results
Assay results have been received for the first 5 holes drilled at Corrabeth Ridge.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Corrabeth Ridge project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the sourceRaised money for drilling
The company has raised $28 million in a entitlement offer to fund drilling at Corrabeth Ridge.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceWas drilling
The 19,000 metre programme at Corrabeth Ridge is in progress, with about half of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceRaised money for exploration
Proceeds of the $6 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceRaised money for exploration
Proceeds of the $5 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Quorrabin Gold
Priority twoRaised money for drilling
The company has raised $37 million in a placement to fund drilling at Ombrelee Ridge.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceSaid more drilling is planned
Follow-up drilling at Ombrelee Ridge is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceHad a tenement granted
4 exploration licences near Ombrelee Ridge were granted to Quorrabin Gold.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceWas hiring a geology leader
Quorrabin Gold is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the source
Quillaby Gold
Priority twoWas drilling
The 18,000 metre programme at Quarramere Dam is in progress, with about a third of the metres drilled.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geology leader
Quillaby Gold is recruiting an Exploration Manager to lead its Queensland team.
A new geology leader often reviews the tools the team uses.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceApplied for a tenement
Quillaby Gold applied for an exploration licence of 24 blocks adjoining Quarramere Dam.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Marrendale Copper
Priority twoSaid more drilling is planned
Follow-up drilling at Sennowby Gap is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceHad more than a year of funding
The company held $32 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Sennowby Gap has been released, based on 566 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceApplied for a tenement
Marrendale Copper applied for an exploration licence of 119 blocks adjoining Sennowby Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Sennowby Gap team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Hennaby Nickel
Priority twoWas hiring for a field or core yard role
Field assistants and a core yard technician are needed at Mirrabrae Crossing for the coming drilling season.
They're adding field or core yard staff, which points to drilling ahead.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Mirrabrae Crossing has been released, based on 204 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceHad six to twelve months of funding
Cash of $7 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Mirrabrae Crossing is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Results from 36 holes at Mirrabrae Crossing confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Hennaby Nickel applied for an exploration licence of 35 blocks adjoining Mirrabrae Crossing.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Mirrabrae Crossing team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Mallowick Exploration
Priority twoHad six to twelve months of funding
Cash of $6 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Yendaree Rise is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Yendaree Rise has been released, based on 225 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Bellandry Exploration
Priority twoWas hiring a geologist
We are looking for two Exploration Geologists to join our Gennaloo Creek team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceHad more than a year of funding
The company held $51 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceApplied for a tenement
Bellandry Exploration applied for an exploration licence of 106 blocks adjoining Gennaloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Gennaloo Creek is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceApplied for a tenement
Bellandry Exploration applied for an exploration licence of 51 blocks adjoining Gennaloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceApplied for a tenement
Bellandry Exploration applied for an exploration licence of 55 blocks adjoining Gennaloo Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Ullaby Metals
Priority twoApplied for a tenement
Ullaby Metals applied for an exploration licence of 81 blocks adjoining Yendaree Rise.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceSaid drilling would start soon
Drill rigs have been secured and drilling at Yendaree Rise is expected to begin in the coming weeks.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceReported drilling results
Assay results have been received for the first 5 holes drilled at Yendaree Rise.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad more than a year of funding
The company held $16 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceWas selling a mine or project
Ullaby Metals has agreed to sell its Corrabeth Ridge project to focus on Yendaree Rise.
They're selling a mine or project. The drilling data has to be handed over in good order.
Open the sourceApplied for a tenement
Ullaby Metals applied for an exploration licence of 44 blocks adjoining Yendaree Rise.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Sellowmere Minerals
Priority twoPublished a new or updated resource estimate
An updated mineral resource estimate for Maddabrae Dam has been released, based on 509 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceRaised money for drilling
The company has raised $31 million in a share purchase plan to fund drilling at Maddabrae Dam.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceSaid more drilling is planned
Follow-up drilling at Maddabrae Dam is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceLogs in an Access database
Drill hole data is captured in an in-house Microsoft Access database.
They log in an Access database they look after themselves.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Maddabrae Dam team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Maddabrae Dam team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Wallowby Lithium
Priority twoRaised money for drilling
The company has raised $6 million in a share purchase plan to fund drilling at Sennowby Gap.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Sennowby Gap is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceApplied for a tenement
Wallowby Lithium applied for an exploration licence of 24 blocks adjoining Sennowby Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Sennowby Gap has been released, based on 220 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Sennowby Gap team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Noorabin Resources
Priority twoApplied for a tenement
Noorabin Resources applied for an exploration licence of 135 blocks adjoining Pellowin Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceHad more than a year of funding
The company held $34 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Pellowin Gap team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the sourceSaid more drilling is planned
Follow-up drilling at Pellowin Gap is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceReported drilling results
Assay results have been received for the first 29 holes drilled at Pellowin Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Pellandry Metals
Priority twoSaid drilling is planned for later
A maiden drilling programme at Jarrabrae Flat is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceReported drilling results
Results from 15 holes at Jarrabrae Flat confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for exploration
Proceeds of the $15 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceApplied for a tenement
Pellandry Metals applied for an exploration licence of 79 blocks adjoining Jarrabrae Flat.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Nambrewin Resources
Priority twoSaid more drilling is planned
Follow-up drilling at Finnowar Well is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceRaised money for exploration
Proceeds of the $13 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceHad a tenement granted
2 exploration licences near Finnowar Well were granted to Nambrewin Resources.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceReported drilling results
Results from 11 holes at Finnowar Well confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceWas hiring for a geology data role
We are seeking a Database Geologist to manage drill hole data for our Finnowar Well project.
They're hiring someone to manage geology data. That person will care how core is logged.
Open the source
Tarcomby Resources
Priority twoSaid drilling is planned for later
A maiden drilling programme at Finnowar Well is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceRaised money for drilling
The company has raised $24 million in a placement to fund drilling at Finnowar Well.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceWas hiring a geology leader
Tarcomby Resources is recruiting an Exploration Manager to lead its Western Australia team.
A new geology leader often reviews the tools the team uses.
Open the sourceLogs in spreadsheets
Geological logging is recorded in Excel templates on field laptops.
They log in spreadsheets, so there's no logging system to replace.
Open the source
Aldrabeck Gold
Priority twoHad more than a year of funding
The company held $9 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceSaid more drilling is planned
Further drilling is planned at Dallowick Creek to follow up these results.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceApplied for a tenement
Aldrabeck Gold applied for an exploration licence of 107 blocks adjoining Dallowick Creek.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Brimmelow Gold
Priority twoSaid more drilling is planned
Follow-up drilling at Larrowby Bore is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceHad six to twelve months of funding
Cash of $9 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceApplied for a tenement
Brimmelow Gold applied for an exploration licence of 110 blocks adjoining Larrowby Bore.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Nettledown Rare Earths
Priority twoSaid drilling is planned for later
A maiden drilling programme at Quarramere Dam is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceHad more than a year of funding
The company held $33 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Quarramere Dam team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceReported drilling results
Results from 20 holes at Quarramere Dam confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Nettledown Rare Earths applied for an exploration licence of 27 blocks adjoining Quarramere Dam.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Bunnaway Exploration
Priority twoApplied for a tenement
Bunnaway Exploration applied for an exploration licence of 83 blocks adjoining Sennowby Gap.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceReported drilling results
Results from 12 holes at Sennowby Gap confirm mineralisation over 3 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceHad six to twelve months of funding
Cash of $7 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Sennowby Gap is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceReported drilling results
Assay results have been received for the first 17 holes drilled at Sennowby Gap.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Ambrewick Minerals
Priority twoRaised money for exploration
Proceeds of the $13 million placement will be applied to exploration across the company's South Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid drilling would start soon
A 12,000 metre reverse circulation drilling programme at Yarnabeck Bore is scheduled to start in December.
Drilling is about to start. Logging gets set up before the rig arrives, so this is the best time to call.
Open the sourceApplied for a tenement
Ambrewick Minerals applied for an exploration licence of 65 blocks adjoining Yarnabeck Bore.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Merrowick Lithium
Priority twoLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Finnowar Well is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Finnowar Well has been released, based on 159 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceRaised money for exploration
Proceeds of the $9 million placement will be applied to exploration across the company's Northern Territory tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Finnowar Well team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Quambaroo Metals
Priority twoHad just finished a drilling programme
The drilling programme at Bindlemoor Tank was completed during the quarter, for 28 holes and 7,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceRaised money for exploration
Proceeds of the $5 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceApplied for a tenement
Quambaroo Metals applied for an exploration licence of 136 blocks adjoining Bindlemoor Tank.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Bindlemoor Tank team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Wendaroo Minerals
Priority twoHad six to twelve months of funding
Cash of $5 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceReported drilling results
Assay results have been received for the first 8 holes drilled at Tuddamere Hill.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Tuddamere Hill is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Tuddamere Hill team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Elkaroo Gold
Priority twoRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid more drilling is planned
Follow-up drilling at Bindlemoor Tank is being planned.
More drilling is coming but no date is given. Worth a call to find out when.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the sourceReported drilling results
Results from 12 holes at Bindlemoor Tank confirm mineralisation over 2 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Elkaroo Gold applied for an exploration licence of 69 blocks adjoining Bindlemoor Tank.
They've applied for new ground. It's an early sign of exploration to come.
Open the source
Garrabond Rare Earths
Priority twoApplied for a tenement
Garrabond Rare Earths applied for an exploration licence of 24 blocks adjoining Kerrawick Tank.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Kerrawick Tank team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourcePublished a new or updated resource estimate
An updated mineral resource estimate for Kerrawick Tank has been released, based on 136 drill holes.
A resource estimate is built on drill logs. It shows how much drilling data they manage.
Open the sourceRaised money for exploration
Proceeds of the $11 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Kerrawick Tank is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceLogs on paper
Lithology and structure are logged on paper sheets and typed up at the end of each shift.
They log on paper. That's the clearest fit for digital core logging.
Open the source
Dumbarrow Rare Earths
Priority twoRaised money for drilling
The company has raised $25 million in a placement to fund drilling at Kerrawick Tank.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Kerrawick Tank is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Northern Territory tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceRaised money for exploration
Proceeds of the $14 million placement will be applied to exploration across the company's Northern Territory tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the source
Addlemoor Minerals
Priority twoHad just finished a drilling programme
The drilling programme at Garrowmere Hill was completed during the quarter, for 51 holes and 7,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceHad six to twelve months of funding
Cash of $2 million at the end of the quarter funds the planned programme for the next three quarters.
They're funded for six to twelve months. That covers this programme.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Garrowmere Hill team on a two weeks on, one week off roster.
They're adding geologists, which usually means more core to log.
Open the source
Harkendale Lithium
Priority twoHad just finished a drilling programme
The drilling programme at Vennamoor Creek was completed during the quarter, for 33 holes and 18,000 metres.
The programme has just finished. The logs are being checked and pulled together now.
Open the sourceHad more than a year of funding
The company held $59 million in cash at the end of the quarter, enough to fund planned work for more than twelve months.
They're funded for more than a year, so a purchase is realistic.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceReported drilling results
Assay results have been received for the first 5 holes drilled at Vennamoor Creek.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's New South Wales tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceReported drilling results
Assay results have been received for the first 12 holes drilled at Vennamoor Creek.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Hollowmere Minerals
Priority twoSaid drilling is planned for later
A maiden drilling programme at Pirrimoor Soak is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceApplied for a tenement
Hollowmere Minerals applied for an exploration licence of 122 blocks adjoining Pirrimoor Soak.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceRaised money for drilling
The company has raised $7 million in a placement to fund drilling at Pirrimoor Soak.
The money for drilling is raised, so the programme is likely to go ahead.
Open the sourceReported drilling results
Results from 13 holes at Pirrimoor Soak confirm mineralisation over 5 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the sourceApplied for a tenement
Hollowmere Minerals applied for an exploration licence of 116 blocks adjoining Pirrimoor Soak.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceReported drilling results
Results from 39 holes at Pirrimoor Soak confirm mineralisation over 6 kilometres of strike.
They've drilled recently and are reporting on it, so the logging work is fresh.
Open the source
Thornabeck Lithium
Priority twoHad a tenement granted
3 exploration licences near Stannabrook Flat were granted to Thornabeck Lithium.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Stannabrook Flat is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the source
Kimbelow Minerals
Priority twoHad a tenement granted
2 exploration licences near Belmarrup Well were granted to Kimbelow Minerals.
New ground has been granted. Exploration and drilling usually follow.
Open the sourceRaised money for exploration
Proceeds of the $8 million placement will be applied to exploration across the company's Western Australia tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceWas drilling
Diamond drilling is under way at Belmarrup Well, with 25 holes completed to date.
Core is coming out of the ground now, so logging is a live job for their geologists.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the source
Farrabin Lithium
Priority twoSaid drilling is planned for later
A maiden drilling programme at Wollabeck Hill is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceApplied for a tenement
Farrabin Lithium applied for an exploration licence of 78 blocks adjoining Wollabeck Hill.
They've applied for new ground. It's an early sign of exploration to come.
Open the sourceRaised money for exploration
Proceeds of the $13 million placement will be applied to exploration across the company's Queensland tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the source
Kurrawen Metals
Priority twoWas hiring a geology leader
Kurrawen Metals is recruiting an Exploration Manager to lead its Tasmania team.
A new geology leader often reviews the tools the team uses.
Open the sourceLogs in commercial logging software
Drill hole data is captured and validated in a commercial geological logging system.
They already use commercial logging software. It lowers them on the list but doesn't remove them.
Open the sourceRaised money for exploration
Proceeds of the $7 million placement will be applied to exploration across the company's Tasmania tenements.
They have fresh money for exploration. Some of it usually goes to drilling.
Open the sourceSaid drilling is planned for later
A maiden drilling programme at Lowanbeck Bore is planned for the second half of 2027.
Drilling is planned but some way off. One to keep warm.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Lowanbeck Bore team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the sourceWas hiring a geologist
We are looking for two Exploration Geologists to join our Lowanbeck Bore team on a eight days on, six days off roster.
They're adding geologists, which usually means more core to log.
Open the source
Showing 25 of 530Show 25 more
Prepared by Evidential for Drillnote, a synthetic seller. List of 12/10/2026.